Façade restoration for an existing commercial building.
Restoration works to the heritage Hornby Lighthouse as featured on 9 News.
Complex of 13 x townhouses with common basement carpark structure with various waterproofing and structural defects
$1M
Various modification to the existing unit
Out of plane precast concrete panel installed at wrong locations over 11 x stories, rectification works specifications
$200,000
Various remedial tasks, including concrete spalling rectification and façade safety measures.
Concrete spalling and steel reinforcement corrosion defects, repair specification reports
$500,000.00
Repair specifications to the defective / collapsed floor
Repair specifications to the defective jetty structure
$100,000
Repair specification report to the Shell canopy
$250,000
Repair specification report for the existing defects to the tower
Repair specification report for defects to the shoring walls of the shopping centre carpark levels.
Various remedial tasks, including steel reinforcement, concrete spalling rectification, and drainage system repairs.
$300,000