$500,000
$200,000
Various temporary structures
$3,000,000
$1M
New steel framed shed / warehouse
Outdoor recreational area with 2 netball courts and large sitting / playing grassed areas. Substation footing design
$1,500,000
Open channel investigation works
Condition survey audit for over 900 retaining walls with total length of more than 26km and heights up to 10m.
$300,000
(North west rapid transit) pedestrian bridge
$500,000.00
Various remedial engineering, repair specification report to the existing defects
Various temporary engineering works